Pondicherry, Chennai
Aroun Systems delivers comprehensive fire hydrant system installation solutions for large industrial complexes and commercial establishments. Our expert team ensures complete network integration with proper water supply systems and pressure requirements for optimal fire protection coverage.
We provide end-to-end fire hydrant system installations including main piping networks, branch connections, pressure boosting systems and monitoring equipment. Our systematic approach guarantees reliable performance and complete compliance with national fire safety standards and regulations.
Complete fire hydrant network installation with main pipelines, branch connections and strategic hydrant point placements for maximum coverage
Professional installation of pressure boosting systems, water storage tanks and pumping arrangements to maintain required flow rates
Integration with building management systems and fire alarm networks for coordinated emergency response and monitoring capabilities
Comprehensive testing and commissioning services including flow tests, pressure tests and functional checks for system validation
Our engineers design complete fire hydrant systems considering building layout, water supply availability and risk assessment for optimal protection coverage and performance standards.
Seamless integration of fire hydrant systems with other safety systems including fire alarms, sprinklers and building management for coordinated emergency response operations.
A complete fire hydrant system includes underground piping network, surface hydrant points, landing valves, hose boxes, pressure boosting pumps, water storage tanks and monitoring panels for comprehensive fire protection coverage.
Hydrant placement follows IS standards with strategic positioning considering building layout, fire risk areas and hose reach requirements. Typically placed at 30-45 meter intervals for optimal coverage and accessibility during emergencies.
Fire hydrant systems require minimum 3.5 kg/cm² pressure at the farthest point with flow rates of 900-1800 LPM depending on building occupancy and risk category as per National Building Code requirements.
Yes, we provide complete system documentation including as-built drawings, test certificates, compliance reports and operation manuals. All installations come with ISO 9001:2015 quality certification and fire department approval documents.
Large industrial fire hydrant system installations typically take 4-8 weeks including design approval, material procurement, installation and commissioning phases. Complex projects may require additional time for integration with existing systems.